We operate all our servers from one of the UKs leading datacentres based in Maidenhead,
Berkshire.
The site specification is:
- 450mm raised floor void
- Redundant parallel UPS system @ N+1
- Close control downflow air conditioning units @ N+1
- RapidSwitch staff on-site 24/7
- 2 megawatt substation with 11kV feed
- Backup diesel generator
- Fire detection and gas surpression system
- 2.5 metre pallisade security fence around perimeter
- PAC security access system
- 24/7 recorded CCTV on every rack aisle and all entrances
- Multiple fibre routes out of the building, diversely routed
- Multiple 10 gigabit ethernet network connections to London
- Cat6 shielded structured cabling

We've rolled out many sites with Flint in both CF7 and CF8 environments. They're helpful, go the extra mile to help and are great to deal with.